A N A T O M Y O F D I A M O N D M I N I N G & P R O C E S S I N G
T H E R E A R E T H R E E V E R S I O N S A V A I L A B L E 1/ S T A N D A R D V E R S I O NS H O W N B E L O W. 2/ A S B E L O W W I T H Y O U R L O G O A D D E D A B O V E T H E T I T L E. 3/ C H A R T T H A T F E A T U R E S S U P P L I E R S P A N E L S. S H O W N A T B O T T O M. P R I C E S A R E U N D E R E A C H I M A G E
Understandably, mine planning departments appreciate a visual overview
CHART
PRICE ZAR
PRICE US$
PRICE GBP
PRICE EURO
CODE DMS/L Large chart as above
ZAR 1 400.00
US$ 220.00
GBP 138.00
EURO 152.00
CODE DMS/M Medium chart as above
ZAR 1 200.00
US$ 177.00
GBP 110.00
EURO 122.00
CODE DML/L Large chart as above with logo
ZAR 1 400.00*
US$ 220.00*
GBP 138.00*
EURO 152.00*
CODE DMS/M Medium chart as above with logo
ZAR 1 200.00*
US$ 177.00*
GBP 110.00*
EURO 122.00*
*Production fee of 25% is added to first chart. Thereafter price remains as indicated.
CHART
PRICE ZAR
CODE DMP/L Large chart as above
ZAR 700.00
Description: The chart is an overview of
a typical modern diamond mine that includes the surface and underground mining
infrastructure, process plant and process flow diagram. The chart features
Kimberlite vertical ore body mining, alluvial mining, coastal and marine
mining.
Within
the Kimberlite Mining infrastructure is the development, mining, extraction and ventilation levels.
Mining
methods: Open bench mining, Sub-level caving, Mechanised block caving, Conventional
block caving, Vertical crater retreat, Mechanised fissure mining, etc.
Content: Feed preparation plant, Primary scrubbing, screening and de-gritting plant, DMS
plant, and Flocculant plant. Vertical shaft infrastructure, Open cast mining,
Alluvial mining, Marine mining, Ship based recovery plant.
Vertical
ore-body mining infrastructure, Ore & waste bins/silos, Shuttle conveyors,
Rail hoppers, Tipping station, Ore skips, Access ramp, Underground crusher,
Grizzly, Impact hammer, Ventilation shaft, Return airway, Long hole drills,
Load haul dumper (LHDs), Radio-controlled LHDs, Locomotives, Fan drilling,
Cross-cut, Crown pillars, Undercut drifts, Workshop, Ore draw-off points,
Winch, Scrapers, Haulages, Trackless mining methods, Settlers, Sub-level
crushing plant, Transfer house, Primary stockpile, Primary crushing, Ore tip,
Tamrock long-hole drill and more.