A N A T O M Y   O F
D I A M O N D   M I N I N G
&  P R O C E S S I N G

T H E R E   A R E   T H R E E   V E R S I O N S   A V A I L A B L E
1/  
S T A N D A R D   V E R S I O N   S H O W N   B E L O W.
2/  A S   B E L O W   W I T H   Y O U R   L O G O   A D D E D   A B O V E  
T H E   T I T L E.
3/  C H A R T    T H A T    F E A T U R E S    S U P P L I E R S    P A N E L S.
S H O W N  A T   B O T T O M.
P R I C E S   A R E    U N D E R   E A C H   I M A G E      


Understandably, mine planning departments appreciate a visual overview


CHART                                  
PRICE
ZAR          
PRICE
US$         
PRICE
GBP
          
PRICE
EURO 
  
CODE DMS/L
Large chart as above
ZAR
1 400.00
US$
220.00
GBP
138.00
EURO
152.00
CODE DMS/M 
Medium chart as above
ZAR
1 200.00
US$
177.00
GBP
110.00
EURO
122.00
CODE DML/L 
Large chart as above with logo
ZAR
1 400.00*
US$
220.00*
GBP
138.00*
EURO
152.00*
CODE DMS/M 
Medium chart as above with logo
ZAR
1 200.00*
US$
177.00*
GBP
110.00*
EURO
122.00*

*Production fee of 25% is added to first chart.
Thereafter price remains as indicated.


CHART                                                                           
PRICE ZAR               
CODE DMP/L  Large chart as aboveZAR 700.00

Description: The chart is an overview of a typical modern diamond mine that
includes the surface and underground mining infrastructure, process plant
and process flow diagram.
The chart features Kimberlite vertical ore body mining, alluvial mining, coastal
and marine mining.
Within the Kimberlite Mining infrastructure is the development, mining,
extraction and ventilation levels.  
Mining methods:
Open bench mining, Sub-level caving, Mechanised block caving,
Conventional block caving, Vertical crater retreat, Mechanised fissure mining, etc.  
Content:
Feed preparation plant, Primary scrubbing, screening and de-gritting plant,
DMS plant, and Flocculant plant. Vertical shaft infrastructure,
Open cast mining, Alluvial mining, Marine mining, Ship based recovery plant.
Vertical ore-body mining infrastructure, Ore & waste bins/silos, Shuttle conveyors,
Rail hoppers, Tipping station, Ore skips, Access ramp, Underground crusher,
Grizzly, Impact hammer,
Ventilation shaft, Return airway, Long hole drills, Load haul dumper (LHDs),
Radio-controlled LHDs, Locomotives,
Fan drilling, Cross-cut, Crown pillars, Undercut drifts, Workshop,
Ore draw-off points, Winch, Scrapers, Haulages, Trackless mining methods,
Settlers, Sub-level crushing plant,
Transfer house, Primary stockpile, Primary crushing, Ore tip,
Tamrock long-hole drill and more.  

Size:  1830mm x 1 380mm