D A M C O N S T R U C T I O N & E N G I N E E R I N G
L e s o t h o H i g h l a n d s W a t e r P r o j e c t
P R I C E
CHART
PRICE ZAR
PRICE US$
PRICE GBP
PRICE EURO
LHWP/L Large chart as above
ZAR 700.00
US$ 133.00
GBP 85.00
EURO 93.00
C O N T E N T
Description: The chart is a detailed
overview of the Lesotho Highlands Water Project Phase 1A, Lesotho, southern
Africa. It includes cut-away details of the Katse dam and major elements of the
project. Content: Katse Dam, Low level
outlet, Pre-formed joint, Access galleries. Power station. Malibamatsu bridge,
Intake tower, Transfer tunnels, Ngoajane flow-measuring chamber, Muela
Underground Power House, Muela tail-water dam, Upstream surge chamber, Downstream surge chamber, Bifurcation chamber, Penstock, De-gritting chamber,
De-watering shafts, Cut and cover siphon, Ash river outfall etc.
Tunnel
Boring Machines: Robbins, Wirth and Atlas Copco Tunnel Boring Machines.
Size: 2000mm x 1500mm