T H E R E A R E T H R E E V E R S I O N S A V A I L A B L E 1/ S T A N D A R D V E R S I O NS H O W N B E L O W. 2/ A S B E L O W W I T H Y O U R L O G O A D D E D A B O V E T H E T I T L E. 3/ C H A R T T H A T F E A T U R E S S U P P L I E R S P A N E L S. S H O W N A T B O T T O M. P R I C E S A R E U N D E R E A C H I M A G E
P R I C E S
CHART
PRICE ZAR
PRICE US$
PRICE GBP
PRICE EURO
CODE HRS/L Large chart as above
ZAR 1 400.00
US$ 220.00
GBP 138.00
EURO 152.00
CODE HRS/M Medium chart as above
ZAR 1 200.00
US$ 177.00
GBP 110.00
EURO 122.00
CODE HRL/L Large chart as above with your logo added
ZAR 1 400.00*
US$ 220.00*
GBP 138.00*
EURO 152.00*
CODE HRL/M Medium chart as above with logo
ZAR 1 200.00*
US$ 177.00*
GBP 110.00*
EURO 122.00*
A production fee of 25% is added for the first chart. Thereafter price remains as indicated.
P R I C E
CHART
PRICE ZAR
CODE HRP/L Large chart as above
ZAR 700.00
C O N T E N T
Description: The emphasis of this chart
is on underground and surface mining infrastructure.
Mining
Methods: Open-cast mining, Conventional drill and blast mining, Mechanised hard rock
mining, Throw blasting, Bord and pillar etc.
Content: Vertical and decline
access, Decline access features mechanised mining methods with conveyor
ore-removal, road hauler ore-removal and rail hopper ore-removal.
The
stope level features breast mining and up-dip, down-dip conventional mining.
Details on rail configurations, rock support, conveyor systems, typical
machinery & equipment, shaft sinking, horizontal development, ventilation
route, ventilation shaft, extraction fans, shaft support infrastructure, mine
personnel featured.